54 – A new production line at France Elévateur
With its new building operational since the beginning of 2022, on its site in Flavigny-sur-Moselle (54), the nacelle manufacturer now has more space and can thus increase its production. This new building called FE3 Bis, with an area of 1800 m2, has seen its entire organization designed to optimize logistics flows and industrialize the entire assembly process. The total production area of the FE group in France and Spain now reaches nearly 25,000 m2. During its inauguration, France Elévateur took the opportunity to present some of the latest models in its range, dedicated in particular to rural and forest environments or certain compact models adapted to urban work. Products designed to combine performance and simplicity of implementation for a reduced operating cost.
https://jdlgroupe.com/2022/05/23/une-nouvelle-ligne-de-production-chez-france-elevateur/
Our other news
See allJoin the largest community of industrial suppliers
- Helping you with your ongoing technology watch
- Provide you with detailed supplier statistics
- Give you international visibility
Discover the largest catalogue of industrial products on the market
- To offer you the best catalogue of industrial products on the market
- To guarantee you a 100% secure platform
- Enable you to have live remote exchanges