Machine layout, for maintenance teams, against falls from height.
Description
Project study
- Coastal readings / Information gathering on sites (industrial, machines, buildings, natural environment)
- Feasibility study / Project engineering (Summary Pre-Project APS / Detailed Pre-Project APD)
- Drawings / 3D dimensional simulation / Pre-dimensioning of structural elements (RDM) / Installation diagrams
- Detailed Technical Specifications and supplier consultations (STD)
- Validation of Reception Structure (frame, etc.) / Calculation and sizing of workstations (machine safety, metal walkways, work platforms, etc.) and interfaces (lifeline posts, etc.) (PRO)
- Complete modeling of workplaces and workstations (according to the machine directive, ...)
- Recommendation / Integration of the systems studied (industrial machines) / Layout studies (roof railing layout, etc.)
Execution study
- Design and sizing of anchor posts and lifeline post / interface plates for lifeline and anchor points (according to EN 795-2012 / Eurocode 3)
- Design and sizing of stairs, step ladders, ladders, platforms, access walkways, frames, locksmithing/various metalwork (according to EN 85-013 / EN 85-014 / EN 85-015 / EN 85-016 and NF EN 14122-1 / NF EN 14122-2 / NF EN 14122-3 / NF EN 14122-4)
- Sizing of fasteners (structural anchors) as well as concrete blocks + reinforcement (according to DTU in force)
- Development of manufacturing plans for custom metal parts (according to Eurocode 3)
- Verification by calculation or test of the resistance of existing reception structures (wood-metal-concrete structures / brick-concrete-stone-earth supports / machines / …)
- Realization of work execution plans (layout plans, assembly, assembly procedure, etc.).
Technical details
DIAGNOSIS AND ADVICE
- Inventory and current work situation (existing documentation, resources made available, intervention method in force, etc.).
- Understanding the professions and activities of technicians during interventions involving a risk of falls.
- Assessment of fall risks (quantify, prioritize, etc.) based on operations.
- 3D modeling of work situations studied in their environment.
- Recommendations for several technical security solutions including all phases of the intervention (access, movement at height and workstation).
- Creation of 3D models of the proposed solutions and integration into the modeling of the work situation.
- Budget estimates of technical solutions presented.
Administrative documents
Video
DAVOC
Safety / Hygiene / Environment / IPEDescription
Our approach Our engineers, specialists in work at height prevention, are involved from the project definition phase to their technical implementation. They provide security or maintenance managers as well as operational teams with multiple means of achieving their objectives (compliance with lifeline regulations / machine directive / ...). Our ...